How the pilots are expected to generate repayment cash

The model follows a simple sequence: launch each pilot, process qualified material, sell concentrate, collect payment, and pay the costs needed to keep operating. Cash left after those costs supports the loans. Forecast revenue becomes useful to investors only when it is collected and the payments ahead of participation are covered.

These are conditional forecasts, not operating results or promised distributions. Read them with the current investor package, PDF model exhibits and collateral report.

One funding round starts one pilot

Each pilot has nine startup months, followed by two production ramp months. Full modeled production begins in M12, M18, M24, M30 and M36 for Pilots 1–5, respectively.

Funding and launchPilot startingEarlier pilots at full modeled rateProject cash in the next six months
M1Pilot 10−$14.10 million · M1–M6
M7Pilot 20−$14.81 million · M7–M12
M13Pilot 31+$35.81 million · M13–M18
M19Pilot 42+$80.85 million · M19–M24
M25Pilot 53+$119.65 million · M25–M30

Project cash is forecast cash after source operations, equipment and the incremental staff/adviser budget, before financing payments, participation and income tax. These future six-month amounts are not cash already held at closing or payments due to an investor.

Round 2 begins before Pilot 1’s first feed. Later investors can review earlier plants’ results, if achieved; all rounds retain operating and repayment risk. The wider cash-generating base shown here depends on actual throughput, recovery and collection.

Request access to the pilot cash-flow exhibits

Follow the payment order

  1. Keep the operations funded. Cover operating, equipment and incremental execution costs, supported by conventional commercial working-capital financing at 18% annual interest.
  2. Pay interest and other amounts due first. Scheduled coupon/principal, exit fees, commitment cash and current working-capital interest come first. Cash above the operating minimum repays working-capital principal before participation.
  3. Share up to 50% of eligible current cash. Use pooled corporate cash across all five pilots. Allocate by original principal among funded, unsatisfied rounds, stopping each at its maximum modeled loan-only IRR. Credit all scheduled fixed receipts in that cap test. Borrowing and prior retained cash are excluded; unused allocations can be redistributed within the same monthly pool.
  4. Retain the remaining cash. At M60, member distributions require obligations settled, working capital repaid and participation rights resolved. The base member residual is $1,107.96m before investor/member tax and unmodeled facility fees; it is not debt-investor proceeds.

Base participation begins at elapsed M17 (1 July 2028). Caps are funded at elapsed M26/M22/M19/M19/M25 for R1–R5, assuming all scheduled fixed debt receipts. R5 can complete participation at elapsed M25 before its own first feed in project M34 because it shares portfolio cash. Rights can continue after principal maturity if a cap is unmet; no cash after M60 is invented.

Working-capital financing is included

The $50 million debt program produces $40.75 million after base issuance and commitment costs, before later exit fees. Separately, modeled conventional commercial working-capital financing funds all negative cash flow at 18% annual interest. Peak drawn principal is $28.16 million at elapsed M10. As-needed draws and principal repayments each total $33.39m; interest totals $2.51m. The first draw is M3 and the base balance is repaid at M17. The operating cash minimum is maintained in the modeled funded case.

Lender availability and final terms remain conditions of the forecast; no executed facility or facility fee is assumed. Projected collateral value is noncash and does not create financing proceeds.

Three assumptions to examine

Plant performance: each pilot is planned for 100 dry tonnes per hour, with 75% gold and 60% silver recovery targets. Commissioning, feedstock quality, recovery and availability must be demonstrated.

Sales and collection: the model uses fixed precious-metal pricing and stated deductions and settlement timing. It is a planning assumption, not a current market quotation or confirmed customer contract.

Timing and costs: funding and pilot launches must stay aligned. Delays, weaker production, lower prices or higher costs can reduce cash available for repayment. The complete workbook includes the full cash calendar, comparisons with payments due, and what-if scenarios.

Request access to the assumptions and model exhibits

Request the investor package and PDF model exhibits · Compare the five investor rounds