The proposed operation has two connected records: what happens to the material and what happens to the cash.

op-source
01 / Source qualification

The opportunity starts
with accepted material.

Historic mine material must qualify on its own evidence.

Identity, rights, surveyed inventory, representative grade, mineralogy, recoverability and handling conditions determine whether a source lot can enter the plan. An illustrative pile is not a reserve or a contract.

Feed qualification basis →
GVP 43 — GVP 43 | Excavator reclaim at an accepted source-pile work area, shown as a separately scheduled activity. The illustration does not assign one machine simultaneously to source excavation and plant receiving. AI-generated planning illustration.
Planned facility visualization
GVP43 · Planned source-reclaim activity. Image basis →
op-process
02 / Physical recovery

A water-only field circuit.
A measured objective.

Preparation, fine grinding and gravity separation form the field route. Laboratory chemistry is separate.

GVP 04 — GVP 04 | FS01 receiving candidate on a complete mobile carrier. Three receiving sets are retained, two duty and one reserve. The narrow custom assembly needs a complete vendor general arrangement. AI-generated planning illustration.
Planned facility visualization
GVP04 · Wet receiving and screening concept. Image basis →

Receive and prepare

Weigh, identify, sample and wet-screen accepted lots.

→

Crush, grind and classify

Prepare liberation conditions and return coarse material through the circuit.

→

Rougher, scavenger and clean

Recover dense material through serial gravity and cleaner tables.

→

Dewater, dry and seal

Produce a small shipping concentrate stream with controlled moisture.

→
100 t/hNominal dry feed per pilot

Planned throughput, not measured plant capacity.

75% / 60%Au /Ag recovery targets

Controlling base targets for qualified feed.

0.3%Final dry concentrate mass pull

Must be qualified with grade and recovery.

Process and mass balance →
op-water
GVP 21 — GVP 21 | Polish recovered water mechanically. Equipment and operation illustration. AI-generated planning illustration.
Planned facility visualization
GVP21 · Planned mechanical water-polishing equipment. Image basis →
03 / Water and residue

Recovery includes
the water balance.

Tailings are mechanically dewatered. Recovered water returns to the circuit, while exported cake moisture and other losses require measured makeup.

20.491m³/hour process makeup
16%Tailings cake moisture target

Initial fill and ancillary/nonproductive use are additional. Water-only processing does not establish a permit exemption or zero environmental impact.

Water and environmental basis →
op-custody
04 / Saleable output

Seal the concentrate.
Preserve its history.

Assays, dry weight, moisture, container identity, seals and transfer records accompany each shipment. External concentrate sales are the active commercial endpoint.

Reno equipment and operating allowances remain in costs. Internal processing does not gate the active external-refiner invoice.

Commercial endpoint →
GVP 16 — GVP 16 | CU01 concentrate custody room with a continuous removable access route, ground-level weighing pad and sealed-drum handoff. The scale indicator is in standby. The access drawing governs slopes and landings. AI-generated planning illustration.
Planned facility visualization
GVP16 · Planned sealed-concentrate custody handoff. Image basis →
op-settle
05 / Cash conversion

Account for the invoice.
Then account for the receipt.

Weekly dispatch, two-day transit, receipt ten calendar days after delivery and Third-Party Feedstock Supplier payment ten days after actual GVP receipt form the retained timing basis. A delayed receipt moves the linked Third-Party Feedstock Supplier date.

DeliverRecognize receivable
CollectRecord GVP cash
ReconcilePay linked Third-Party Feedstock Supplier share
Connect the process to the model
→
Per recovered gold-equivalent ounce
Fixed model benchmark
$3,000.00
Refiner purchase discount · 15%
−$450.00
Broker fee · 3% of purchase value
−$76.50
Third-Party Feedstock Supplier share · 20% of net base
−$494.70
GVP proceeds before other
operating and financing costs
$1,978.80

Additional refiner fees are zero in the active case. GEO = gold ounces + silver ounces ÷ 100. Under the model, one GEO is equivalent to one gold ounce or 100 silver ounces. Fixed planning economics; contracts require verification.

Inspect the calculation →
op-close
Your next step

See how the process supports the credit case.

Operating sequence, settlement assumptions and funding belong in one diligence conversation.

Request investor access →   Review the debt program →