A visible path
from source lot to settlement.
The proposed operation has two connected records: what happens to the material and what happens to the cash.
The opportunity starts
with accepted material.
Historic mine material must qualify on its own evidence.
Identity, rights, surveyed inventory, representative grade, mineralogy, recoverability and handling conditions determine whether a source lot can enter the plan. An illustrative pile is not a reserve or a contract.
Feed qualification basis →A water-only field circuit.
A measured objective.
Preparation, fine grinding and gravity separation form the field route. Laboratory chemistry is separate.
Receive and prepare
Weigh, identify, sample and wet-screen accepted lots.
Crush, grind and classify
Prepare liberation conditions and return coarse material through the circuit.
Rougher, scavenger and clean
Recover dense material through serial gravity and cleaner tables.
Dewater, dry and seal
Produce a small shipping concentrate stream with controlled moisture.
Planned throughput, not measured plant capacity.
Controlling base targets for qualified feed.
Must be qualified with grade and recovery.
Recovery includes
the water balance.
Tailings are mechanically dewatered. Recovered water returns to the circuit, while exported cake moisture and other losses require measured makeup.
Initial fill and ancillary/nonproductive use are additional. Water-only processing does not establish a permit exemption or zero environmental impact.
Water and environmental basis →Seal the concentrate.
Preserve its history.
Assays, dry weight, moisture, container identity, seals and transfer records accompany each shipment. External concentrate sales are the active commercial endpoint.
Reno equipment and operating allowances remain in costs. Internal processing does not gate the active external-refiner invoice.
Commercial endpoint →Account for the invoice.
Then account for the receipt.
Weekly dispatch, two-day transit, receipt ten calendar days after delivery and Third-Party Feedstock Supplier payment ten days after actual GVP receipt form the retained timing basis. A delayed receipt moves the linked Third-Party Feedstock Supplier date.
operating and financing costs
Additional refiner fees are zero in the active case. GEO = gold ounces + silver ounces ÷ 100. Under the model, one GEO is equivalent to one gold ounce or 100 silver ounces. Fixed planning economics; contracts require verification.
Inspect the calculation →See how the process supports the credit case.
Operating sequence, settlement assumptions and funding belong in one diligence conversation.
Request investor access → Review the debt program →Eligibility, investment terms and commitments are established through approved offering documents and diligence. Forecasts are conditional. Repayment is not guaranteed.