Proposed advisory board

Expertise that strengthens every operating decision.

Five proposed advisers bring distinct mining, metallurgy, engineering, environmental and economic perspectives, with defined deliverables and protected independent review.

Proposed advisory architecture

Five disciplines. One standard of evidence.

Gold Vault’s proposed Technical and Operational Advisory Board connects process, operating, engineering, environmental and financial judgment across all five pilots. Each seat has a defined review mandate, contracted delivery expectations and a qualified deputy. Operating leaders remain accountable for execution; advisors provide specialist challenge and documented recommendations at critical decisions.

Proposed candidates, pending engagement

These individuals are proposed candidates selected from public professional profiles. They have not been appointed by Gold Vault. Participation is subject to individual consent, availability, employer approval, conflict review and signed engagement. Listing a person or firm does not imply endorsement of Gold Vault or its investment projections.

Execution excellence is established through competent people, tested equipment, controlled work, independent challenge and measured results. These standards are intended to reduce risk; they cannot guarantee recovery, profits, investment returns or an absence of incidents.

Explore the execution model · See corporate accountability

Proposed five-seat slate

Specialists selected for the work ahead

The proposed slate combines two SRK specialists, two SLR specialists and a North America-based Ausenco engineering leader. Their published experience informs these selections. Appointment, availability, credentials, employer consent and committed delivery capacity still require verification.

Process and Metallurgy Advisor

Kash Kelloff

SRK ConsultingPrincipal Mining ConsultantUnited States; North American project experience

Proposed candidate — pending consent, availability and signed engagement.

Relevant experience

Kash Kelloff brings executive and technical management experience in mining and mineral processing. His published SRK profile covers gold and silver projects, comminution, wet and dry milling, fine grinding, water treatment and filtration, with operating and consulting work that includes the United States, Canada and Mexico.

Proposed GVP remit

  • Review the representative feed and variability testwork program, sampling assumptions, mineralogy and mass, metal and water balances.
  • Challenge the full-feed grinding basis, gravity separation logic, recovery assumptions, filtration duty and water-only process boundaries before design release.
  • Require engineering and OEM evidence for throughput, operating limits, reserve capacity and abnormal operating modes; define credible derates where evidence requires them.
  • Advise on ore performance tests, reconciliation tolerances, concentrate quality and the technical evidence needed before replication to the next pilot.

Required deliverables

Signed testwork review and technical limitations; Approved process acceptance criteria; Performance-test exceptions and corrective actions; Replication recommendation tied to measured results.

Primary gatesG1G2G4G5G6G7

Management interfaces

Technical Services Manager and Chief Metallurgist; Five Pilot Program General Manager; Laboratory Lead and Site Quality Specialist; Integration and EPCM provider; OEM specialists.

Independence: SRK may develop the owner technical package. Another qualified, unaffiliated reviewer must independently accept that same package; an SRK colleague does not create firm-level independence.

Read the official professional biography

Operational Readiness and Ramp-up Assurance Advisor

Linda Dufour

SLR ConsultingPrincipal MetallurgistUSA

Proposed candidate — pending consent, availability and signed engagement.

Relevant experience

Linda Dufour is a US-based SLR metallurgist whose published profile describes more than 30 years in process engineering and study or project management. Her experience includes gold and silver operations, scaling testwork into plant design, operator training, commissioning, optimization and remediation across cold and desert environments.

Proposed GVP remit

  • Review readiness of the operating organization, procedures, training, shift coverage, maintenance support and startup materials before first feed.
  • Challenge cold, wet and ore commissioning plans, operating scenarios, trial duration, measurement quality and the evidence required to leave ramp-up.
  • Witness selected performance demonstrations and review laboratory quality, mass and metal reconciliation, operator competence and unresolved commissioning defects.
  • Review campaign move and restart readiness and recommend whether lessons from one pilot are sufficiently resolved for use across the five-pilot program.

Required deliverables

Operating-readiness assessment; Witnessed commissioning and ramp-up findings; Competence and staffing exceptions; Independent acceptance recommendation where eligible.

Primary gatesG3G4G5G6G7G8

Management interfaces

Five Pilot Program General Manager; Pilot General Manager and Plant Superintendent; Technical Services Manager and Chief Metallurgist; Training and Competence Lead; Production Shift Lead.

Independence: If SLR designs the operating package or conducts implementation, SLR must recuse from independent acceptance of that work. Independent operational assurance requires an eligible reviewer with direct evidence access and no delivery incentive.

Read the official professional biography

Plant Engineering and OEM Integration Advisor

Ben Percy

AusencoDirector, Engineering – VancouverVancouver, British Columbia, Canada

Proposed candidate — pending consent, availability and signed engagement.

Relevant experience

Ben Percy is a Vancouver-based mechanical engineer and Ausenco engineering director with more than 18 years in mineral processing. His published experience includes mills, filter presses, pumps, piping and conveyors, together with fabrication oversight and commissioning in Utah and Nevada and engineering leadership on Las Chispas in northern Mexico.

Proposed GVP remit

  • Review equipment interfaces, layouts, mechanical and electrical boundaries, access, lifting provisions, guarding, pressure containment and maintainability with the responsible engineers.
  • Challenge the reliability analysis, critical spare holdings, reserve-equipment strategy, common-cause failures and recovery times before design freeze.
  • Review OEM guarantees, model-specific manuals, factory and site acceptance plans, installation tolerances, preservation requirements and commissioning support.
  • Require witnessed reserve-equipment and safe-state demonstrations, and check relocation damage, reconnection and recommissioning controls.

Required deliverables

Equipment-interface and maintainability review; Reliability and critical-spares challenge; FAT/SAT and reserve-capacity findings; Engineering exception and closure register.

Primary gatesG2G3G4G6G7G8

Management interfaces

Reliability and Engineering Manager; Mechanical Maintenance Technician; Electrical and Instrumentation Technician; Operational Technology and Automation Engineer; Integration and EPCM provider; OEM specialists.

Independence: If Ausenco supplies design, engineering or implementation for a package, independent acceptance of that package must come from a qualified unaffiliated firm. Commercial interests of OEMs must also be declared.

Read the official professional biography

Environmental, Permitting and Closure Advisor

Katie Bertrando

SRK ConsultingEnvironmental ScientistReno, Nevada, USA

Proposed candidate — pending consent, availability and signed engagement.

Relevant experience

Katie Bertrando is an SRK environmental scientist in Reno. Her published profile identifies Nevada environmental-management credentials and experience with mine plans of operation, permitting-related assessments, environmental due diligence, NEPA analysis, hydrologic sampling and closure planning. This is closely aligned with the planned Nevada pilot and relocation context.

Proposed GVP remit

  • Review site and campaign jurisdiction, permits, land and water conditions, baseline evidence and the responsibilities retained by the Third-Party Feedstock Supplier.
  • Challenge water containment, residue placement, storm response, historical-material hazards and monitoring obligations with the relevant technical specialists.
  • Require a permit and closure readiness review before mobilization, restart or material site change; escalate unresolved environmental conditions as release blockers.
  • Review reclamation, post-production monitoring, closure acceptance and the funded provision for obligations that survive the common Month 60 commercial endpoint.

Required deliverables

Jurisdiction and permit-condition matrix; Environmental readiness and monitoring review; Closure and surviving-obligation schedule; Unresolved environmental hold register.

Primary gatesG1G3G4G7G8G9

Management interfaces

Director of Health Safety and Environment; Site Health Safety and Environment Lead; Water and Utilities Operator; Logistics and Mobilization Coordinator; Chief Financial Officer; Qualified occupational safety and industrial hygiene specialists.

Independence: Independent acceptance of an SRK-authored environmental or closure package requires a qualified unaffiliated reviewer. Both SRK seats recuse when the firm has the relevant conflict.

Read the official professional biography

Technical-Economic and Risk Governance Advisor; Proposed Advisory Chair

Grant Malensek

SLR ConsultingMining Advisory Technical Director – USUSA

Proposed candidate — pending consent, availability and signed engagement.

Relevant experience

Grant Malensek leads US mining advisory work at SLR. His published profile describes 25 years in mining, including due diligence and independent-engineer reviews for equity and project finance, technical-economic and project-finance models, feasibility studies, capital-cost reviews, valuations and mine strategy.

Proposed GVP remit

  • Challenge the connection between technical evidence and the financial model, including feed variability, recovery, throughput, moves, downtime, working capital and closure costs.
  • Review downside and correlated five-pilot scenarios, committed funding, contingency, counterparty exposure and the liquidity needed to honor obligations.
  • Coordinate the advisory issues register, firm-level conflicts, independent-review assignments, unresolved conditions and formal recommendations to Gold Vault governance.
  • Review the evidence supporting replication, financing milestones and the Month 60 liability reserve and distribution conditions with finance and counsel.

Required deliverables

Technical-economic model challenge; Downside and liquidity assessment; Conflict and independent-review register; Gate recommendations and recorded dissent.

Primary gatesG0G1G2G5G6G9

Management interfaces

Chief Financial Officer; Chief Operating Officer; Five Pilot Program General Manager; Senior Metal Accountant and Quality Manager; Independent accounting assurance provider; Legal counsel.

Independence: SLR cannot independently assure a model or acceptance package that it authored or implemented. The chair must step aside for affected items, and a qualified unconflicted reviewer must be appointed before release.

Read the official professional biography

Protected review

Independent challenge with clear authority

Independence is assessed for each work package and across the reviewer’s firm. A respected name, an advisory title or a second colleague from the same employer does not establish independent assurance.

Separate delivery from acceptance

  • A firm cannot independently accept a package it authored, designed or implemented. All affected seats from that firm recuse from that assurance decision.
  • Where the slate lacks sufficient independence or discipline depth, appoint a qualified unaffiliated reviewer and keep the gate held until review is complete.
  • Independent reviewers receive no fee contingent on favorable findings, financing close, recovery, production or distributions.

Preserve evidence and dissent

  • Reviewers receive direct access to the relevant testwork, operating, assay, maintenance, incident and financial evidence.
  • The decision record retains assumptions, limitations, minority views, unresolved conditions and management’s response.
  • The advisory charter provides escalation to Gold Vault’s governing authority and contracted capital providers where appropriate.

The proposed recommendation quorum is three unconflicted seats from at least two firms, including the affected discipline. This cannot replace required independent assurance, qualified engineering approval or a safety release.

Authority to stop. Evidence to restart.

Every worker is authorized and expected to stop unsafe or uncontrolled work. Site and corporate HSE leadership retain an independent safety hold. The COO, Five Pilot Program General Manager and Pilot General Manager retain their delegated release responsibilities; an advisory recommendation does not itself authorize operation. Restart requires correction, affected-discipline and HSE concurrence, and approval by the accountable release authority. Production targets cannot cancel a hold.

Delivery architecture

Contracted expertise around accountable operators

The advisory slate sits within a wider delivery system. The firms below identify proposed workstreams and potential providers; no engagement is implied. Each contract must specify deliverables, named personnel, competent deputies, field commitments, response times, evidence access and replacement rights.

Owner technical advice — SRK

SRK is proposed for owner technical support, process review and environmental or closure expertise. Its work must define assumptions, test evidence, design limitations and unresolved conditions. Independent acceptance of SRK-authored work belongs to an eligible unaffiliated reviewer.

Integration and engineering — KCA or another accepted EPCM team

A contracted integration and EPCM team coordinates the approved design, procurement interfaces, installation, commissioning sequence and controlled handover. Named engineers, delivery hours, site attendance and responsibility boundaries must be agreed before reliance on the scope.

Equipment specialists — selected OEMs

Model-specific OEM specialists supply application checks, approved manuals and limits, factory and site tests, installation guidance, spares, commissioning support and task instruction. Individual equipment assurances must be reconciled into plant-level performance and safe operating limits.

Independent technical assurance — SLR or another eligible reviewer

Independent reviewers challenge readiness, witness selected tests and report conditions against agreed acceptance criteria. SLR’s proposed advisory role remains subject to firm-wide conflicts: implementation and independent acceptance of the same package cannot sit with SLR.

Financial controls and accounting assurance

The operating package proposes RSM for financial systems implementation and Deloitte or another accepted provider for independent accounting assurance. These are separate engagements, with actual conflicts assessed. Technical-economic advice does not replace qualified accounting assurance, legal advice or financing commitments.

Occupational HSE and industrial hygiene

The environmental advisory seat works with Gold Vault’s HSE leaders and separately qualified occupational-safety and exposure specialists. ERM is one potential specialist provider. Nevada environmental experience does not substitute for every safety, electrical, rescue or industrial-hygiene qualification needed at a site.

Day-to-day reliability remains with the Reliability and Engineering Manager and qualified site maintenance and E&I staff. Pilot leadership owns field execution. On-call advisors do not substitute for competent people required on the actual shift.

Gated execution

Evidence at each transition

Each recommendation must identify the pilot, site, campaign and approved configuration it covers. Safety, legal, containment, custody, critical staffing and funding conditions remain release blockers. Test results and measured operating evidence determine whether a pilot advances or requires correction, restriction or redesign.

Common gates across the five-pilot program
GateDecision subject
G0Charter, legal framework and accountable authority
G1Feasibility, representative testwork, permit pathway and funded budget
G2Approved design and vendor factory acceptance
G3Site, staff, emergency and safe mobilization readiness
G4Cold and wet commissioning
G5Ore performance, reconciliation and settlement evidence
G6Steady operation and replication readiness
G7Campaign move and restart
G8Preservation and closeout
G9Month 60 liabilities, distribution conditions and archive

A review cadence tied to decisions

The proposed cadence includes weekly working reviews during active design and commissioning, monthly operating-evidence reviews, quarterly portfolio and control reviews, and annual independent reassessment. Serious incidents, material custody failures, critical equipment losses and liquidity threats trigger escalation under contracted response arrangements.

Closure receives the same discipline as startup: responsible personnel, evidence, reserves and records must remain available through final duties. Surviving obligations are funded or escrowed before terminal distributions; unfunded payments after Month 60 are not assumed.

One platform, five deployments

Follow accountability into the operating teams

The same competence, reporting and release standards connect corporate governance to each pilot. Local site hazards, actual permit conditions and qualified shift coverage determine the authority to operate.

Execution team overview · Corporate leadership and governance · Recruiting and qualification standards

Primary sources

Published professional and firm information

Candidate fit is based on the official profiles and service descriptions below, reviewed on 22 November 2026. Public biographies establish relevant reported experience, not consent, current availability or a Gold Vault appointment.

Explore the execution model

People. Preparation. Performance.

Exceptional operating results start with exceptional people, clear authority and disciplined preparation. Explore the team behind each pilot, or discuss Gold Vault’s recruiting and execution plans with the corporate office.